At Kamal Cogent Energy Pvt. Ltd., we have a

blog 1
KCE performed the Commissioning for One & Only Royal Mirage, Dubai Analytics
very strong commissioning background for electro-mechanical systems. Cogent Energy Inc., the international joint venture partner was on the Board of Commissioning Collaborative, California. Our Managing Director is an ex-faculty for Building Commissioning at the Pacific Energy Center, San Francisco. We have complete expertise for providing third party commissioning services for New Construction and Existing Operating Buildings for the following systems:

1. Heating Ventilation & Air Conditioning
  1. Reheat AHUs
  2. Single Zone AHUs
  3. Multi Zone AHUs
  4. VRV Systems
  5. Precision AHUs (PAC)
  6. Computer Room AHUs (CRAC)
  7. Laboratory Systems
2. Cooling / Heating
  1. Chillers
  2. Boilers
  3. Pumps
  4. Loops (Primary / Secondary / Condenser)
  5. Steam Systems / Condensate Recovery
3. Lighting
  1. Lighting Controls
  2. Occupancy sensors
  3. Photo cells
  4. Scene lighting / Mood lighting
  5. Lighting panels
  6. Circuiting / switching
  7. Illumination
4. Diesel Generators

5. Electrical Infrastructure / ATS

6. Sewage Treatment Plants

7. Irrigation Systems

8. Fire / Life Safety Systems

9. Plumbing Systems

10. Ventilation
  1. Fan Coil Units
  2. Treated Fresh Air Units (TFA)
  3. Heat Recovery Units / Wheels
  4. Underfloor Air Distribution
  5. Displacement Ventilation
  6. Earth Air tunnels

Our commissioning process follows ASHRAE Guideline 0 and Guideline 1 and includes the following

blog 2
  • Documenting Owners Project Requirements
  • Review of Basis of Design
  • Commissioning Plan development
  • Measurement & Verification (as per IPMVP)
  • Detailed design review
  • Commissioning Specification development
  • Submittal Review
  • Calculation review (fan head / pump head / heat load etc)
  • Installation Verification
  • Witness equipment Start-up and Flushing
  • System Readiness Checking
  • Pre-functional Testing
  • Point-to-Point Testing
  • Functional Performance Testing
    • Manual
    • Trend Log Based
  • TAB Verification
  • Sensor Calibration Verification
  • Findings Log Development and Resolution
  • O&M Manual
  • Systems Manual for Re-commissioning